Structural Rebuild covers load-bearing repair through final inspection, coordinated with your Wheeler building department at every stage.
📞 Call +1-866-484-1409 Now
Full GC oversight, not subcontracted piecemeal.
Inspections built into the schedule, not an afterthought.
Change orders require your written approval.
A defined timeline with milestones, not open-ended.

Inspected before any finish work covers it up.
Signed off by a structural engineer when warranted.
All required permits filed with your local Wheeler building department.
Begins only after structural work is signed off.
Where a rebuild starts looking like a home again.
Certificate of occupancy coordinated with Wheeler inspectors.
A technician answers and lines up a structural evaluation.
Initial framing and load evaluation included.
Full rebuild scope documented with a written price and schedule.
Nothing closes out until final inspection passes.
"Passing structural inspection on the first attempt said a lot about the work quality." — Homeowner, Wheeler
"Not dealing with the permitting office directly saved us a lot of stress." — Homeowner, Wheeler, TX
"The project stayed on the schedule they gave us at the start, which surprised us given the scope." — Homeowner, Wheeler
Yes, we coordinate all required permits with your local Wheeler office.
Most projects run six to twelve weeks from permit to final inspection.
Yes, full GC licensing covers the entire rebuild scope.
When damage warrants it, engineer sign-off is included.
We provide the paperwork adjusters need.
We keep Wheeler rebuild projects on schedule by managing permitting directly.
